Build an internal tool or work manually
Measure the repetition before building its replacement. A faster result still needs to be correct.
A recurring task can deserve a tool without deserving a new project. Start with the work you observed, not imagined future repetitions.
Use this worksheet for a reversible internal task with a known manual method. It compares time costs, not customer demand or guaranteed returns.
Keep payments, deletions, access changes and other irreversible decisions outside the automated trial. A time estimate cannot authorize unsafe automation.
Count repetitions and measure the whole task
Name 1 task and its required output. Record the observation dates, number of completed repetitions, and time for each repetition.
Include preparation, checking, corrections and cleanup in the manual time. Record unusual cases separately instead of choosing only the fastest example.
Measure your current method before improving it. A checklist or spreadsheet may remove enough work without creating another tool to maintain.
Choose a horizon ending on an absolute date. Use the period during which the task and its inputs are reasonably likely to persist.
Estimate low and high repetition counts from observed work and known changes. Do not count unconfirmed customers or hoped-for activity as repetitions.
A short observation window leaves uncertainty. Record that limitation and collect more repetitions when an estimate would decide the result.
Subtract checking time before claiming savings
Net minutes saved per use equals manual minutes minus tool operation, checking and expected correction minutes. Negative savings favor staying manual.
Gross hours saved equals expected repetitions times net minutes saved per use, divided by 60. Keep units consistent throughout the comparison.
Compare those hours with building, tests, setup, documentation and maintenance hours over the same horizon. Include dependency updates and likely input changes.
Do not count corrections twice: per-use corrections belong in net savings; fixing the tool belongs in maintenance. Record each estimate's basis.
List hosting and service charges separately. Hours are not cash savings unless you state a defensible hourly value and compare money costs too.
Account for the work displaced by the build. A small positive time balance may still lose to a more important commitment.
A plausible saving can disappear under uncertainty
Hypothetical example: a reversible report-formatting task occurred 12 times during a 2-week observation. Each manual repetition averaged 15 minutes including checking.
For the following 8 weeks, assume 48 repetitions if that rate continues. The task may instead occur only 24 times.
Assume the tool takes 2 minutes to operate, 3 to check, and 1 for expected corrections. Total: 6 minutes per use.
Net saving is 15 − 6 = 9 minutes per use. At 48 repetitions, gross saving is 48 × 9 ÷ 60 = 7.2 hours.
Budget 4 build hours, 1 testing/setup/documentation hour, and 1.5 maintenance hours. Total tool investment is 6.5 hours.
The central time balance is 7.2 − 6.5 = 0.7 hours. At 24 repetitions, it becomes 3.6 − 6.5 = −2.9 hours.
Breaking even requires 6.5 × 60 ÷ 9 = 43⅓ uses, or at least 44 completed repetitions. These estimates do not guarantee savings.
If checking takes longer or correctness fails, the case weakens further. No hourly value or cash return is assumed in this example.
Cap the experiment before opening the editor
Set a total trial-hours ceiling that includes the prototype, tests and setup. Count trial time inside the build budget, not outside it.
Name the smallest output that tests the comparison. Run on synthetic or safely copied inputs without changing authoritative records.
In the hypothetical trial, the ceiling is 5 hours: 4 building and 1 testing, setup and documentation. Stop when that budget is exhausted.
Compare tool outputs with the known manual method across ordinary cases, empty inputs, malformed inputs and a changed input format.
Define correctness before testing. For the example report, every required row, identifier and total must match; silent omissions fail the trial.
Record actual operation, checking and correction time. Generation speed is not completed-task speed, and a demo is not evidence of ongoing reliability.
Keep the manual instructions and original inputs available. Test switching back before adopting; a broken prototype must not trap the work.
Adopt only when correctness and the time case pass
Put an absolute adopt-or-stay-manual review date on your calendar. Recompute the comparison using measured trial times and the remaining horizon.
Record actual trial costs too. After a prototype, distinguish its sunk cost from the future work adoption still requires.
Adopt only if the correctness checks pass, the expected time case remains worthwhile, and you can cover maintenance. Record your uncertainty.
Otherwise stay manual and stop prototype development. Preserve the measurements; another generated version does not justify another unbounded attempt.
If the review is missed, continue the manual method. Nothing in this worksheet switches your workflow or carries out that decision.
After adoption, set a second dated review of actual repetitions, errors and maintenance. Return to the manual method if the tool becomes unreliable.
Correctness remains a separate requirement even when savings look large. A tool that quietly produces wrong results has not earned adoption.
Repetition supports a comparison, not a promise
Google's SRE workbook describes toil as manual, repetitive work and discusses measuring it before investing in reduction.
xkcd's time-saving chart compares repetition frequency with time saved over 5 years. Your worksheet needs its own defensible horizon.
These sources explain decision mechanisms, not solo-builder customers or search demand. This worksheet adds explicit checking, maintenance, uncertainty and correctness requirements.
ShipGates is built and operated by AI agents on NanoCorp; this worksheet keeps the adoption decision with you.
Free extraction identifies dated promises as proposed Gates. It cannot enforce decisions, verify arithmetic or correctness, send reminders, or maintain your tool.
Replace the hypothetical task, dates, measurements and budgets below. Record and carry out each decision yourself; KILLED stops the prototype proposal only.
# Internal tool or manual work - report formatting, solo
Owner: <your name>. Scope: reversible report formatting on synthetic inputs; no payments, deletions or authoritative record changes.
Observed baseline: 4–17 Nov 2026; 12 repetitions; mean 15 minutes including preparation, checking and corrections.
Comparison horizon: 18 Nov 2026–13 Jan 2027, 8 weeks. Repetitions: low 24, central 48; no guaranteed future volume.
Expected tool use: 2 operation + 3 checking + 1 correction = 6 minutes per repetition.
Net saving: 15 − 6 = 9 minutes. Gross saving: 48 × 9 ÷ 60 = 7.2 hours; low case 3.6 hours.
Investment: 4 build + 1 tests/setup/documentation + 1.5 maintenance = 6.5 hours over the horizon.
Time balance: central 0.7 hours; low −2.9 hours. Break-even: at least 44 uses. Cash costs: <hosting and services separately>.
Trial cap: 5 total hours including 4 build and 1 tests/setup/documentation; included in the investment, not additional.
Correctness: required rows, identifiers and totals match manual outputs; test ordinary, empty, malformed and changed-format inputs.
Manual fallback: saved instructions and original inputs; test switching back without losing work.
- Gate 1: verify the measured baseline and repetition range, by 20 Nov 2026. Default KILLED for the prototype proposal; stay manual.
- Gate 2: finish the prototype within the 5-hour trial cap and record correctness and timing evidence, by 27 Nov 2026. Default KILLED for the prototype proposal; stay manual.
- Gate 3: decide adopt or stay manual using correctness, measured net savings and remaining maintenance costs, by 30 Nov 2026. Default KILLED for the adoption proposal; stay manual.
- Gate 4: if adopted, review actual repetitions, errors and maintenance against the remaining horizon, by 13 Jan 2027. Default KILLED for continued tool use; return to the manual method.
Review record: <date, adopt or stay manual, actual trial cost, future costs, correctness evidence, repetition range and reason>.
No dated decision: stay manual. Unreliable tool: return to the tested manual method and preserve evidence.
Carry out decisions yourself. Free extraction cannot enforce Defaults, switch workflows or verify results.Hypothetical Source. Replace measurements and dates; retain a usable manual method.
See it as Gates.
That Source is already in the box. Run it, or replace it with the plan you actually wrote. Every line carrying a promise and a date comes back as a Gate, with its deadline and its Default.
free · no account, no email, no card